NEW HYBRID-OT IN ROSTOCK

ADK realized a hybrid operating room and 2 left heart catheter measuring stations (LHKM) in modular construction for the Klinikum Südstadt Rostock.

The 2-story building with 937 m² was prefabricated at ADK's plant in Neresheim. The production of the 19 modules took 4 months in the factory and the final assembly on site also 4 months.

The Südstadt Clinic complex is located in Rostock's Südstadt district on Südring. It is embedded in a district of system construction from the 1960s. The main building was constructed in the early 1960s as a district hospital with 557 beds. At that time, the hospital was the first new hospital building in the GDR. Additions and extensions were made from the year 2000 onwards.

Go back