NEW HYBRID-OT IN ROSTOCK
ADK realized a hybrid operating room and 2 left heart catheter measuring stations (LHKM) in modular construction for the Klinikum Südstadt Rostock.
The 2-story building with 937 m² was prefabricated at ADK's plant in Neresheim. The production of the 19 modules took 4 months in the factory and the final assembly on site also 4 months.
The Südstadt Clinic complex is located in Rostock's Südstadt district on Südring. It is embedded in a district of system construction from the 1960s. The main building was constructed in the early 1960s as a district hospital with 557 beds. At that time, the hospital was the first new hospital building in the GDR. Additions and extensions were made from the year 2000 onwards.