NEW HYBRID-OT
New construction of a hybrid operating theater with direct connection to the existing building on the 1st floor. Consisting of a standard floor and an attached, smaller technical floor. Installation site is located at the outer edge of the hospital grounds and is accessible via a separate entrance.
Data:
GFA: 212 sqm
Floors: 2
Modules: 4
Construction time on site: 3 months