NEW HYBRID-OT

New construction of a hybrid operating theater with direct connection to the existing building on the 1st floor. Consisting of a standard floor and an attached, smaller  technical floor. Installation site is located at the outer edge of the hospital grounds and is accessible via a separate entrance.

Data:

GFA: 212 sqm

Floors: 2

Modules: 4

Construction time on site: 3 months

Go back