Current Projects

Würzburg, BASF, Placing and Transport of the modules, modular construction, ADK Modulraum

At the 28th June 2019 the transport of 9 modules took place. Because of a short-term site on the planned route to Würzburg – two of the modules  had to detour due to their width.

Grünstadt, surgery department for rent, modular construction, district hospital

On 22 June SWR reported about the new surgery department for rent for the district hospital in Grünstadt. Click here to read the article: SWR article

Wiesbaden, increase, modular construction, office building, ADK Modulraum

An additional floor of a company builiding was getting realized in modular construction in Wiesbaden. The modules with a total floor area of 380 m² get prefabricated in the factory of ADK in Neresheim.

Würburg, BASF, Extenstion office building, ADK Modulraum, modular construction

An additional floor as office extension for more space and an extension with a new entrance and reception area was built in modular construction in Würzburg. The project has a total floor area of 182 m² consisting of 9 modules.

Stadtlohn, Kemper, Office Building, New Office Building, modular construction, ADK Modulraum

An office building with two floors and two connecting passages to an existing building will be realised in modular construction in Stadtlohn. The total floor area of 757 m² consists of 18 modules which will be prefabricated in the factory of ADK.