Current Projects

As part of a workshop, guests of the WiBU Group and ADK Modulraum visited the recently completed extension of the SRH Hospital in Neresheim.

For the SANA Klinikum Offenbach, ADK has realized a surgical extension in a modular design.

craned modules OP extension Offenbach from ADK Modulraum

The final phase of the OP extension at the Sana Hospital in Offenbach has already begun. The final assembly is in full swing so the project can be completed on time. Here are some pictures of the craned modules.

loding of modules on a truck in front of the ADK factory for Sana hospital

In Offenbach, an extension to the Sana Hospital with a gross floor area of ​​1,035m² is being constructed. In the two-storey building, there will be three new operating theaters, which have already been equipped as required by ADK as a general contractor in the factory.

hospital-modular construction-ADK-Modulraum

With a width of over 6 meters and a length of 12 meters of the building modules, the drive through the city center of Neresheim was a millimeter challange.