loding of modules on a truck in front of the ADK factory for Sana hospital

In Offenbach, an extension to the Sana Hospital with a gross floor area of ​​1,035m² is being constructed. In the two-storey building, there will be three new operating theaters, which have already been equipped as required by ADK as a general contractor in the factory.

hospital-modular construction-ADK-Modulraum

With a width of over 6 meters and a length of 12 meters of the building modules, the drive through the city center of Neresheim was a millimeter challange.

Image archiv

In the week from 20 to 24 August 2018, 26 modules with heavy transports will be transferred from the ADK plant to the SRH Fachkrankenhaus in Neresheim.

After the first 226 heavy transports to Walldorf, the other 223 modules for the second office complex for SAP have now arrived in Sant-Leon-Rot.

225 building modules were successfully transported to Walldorf. Now the final assembly of the new office building can begin.