HYBRID OT   DEPARTMENT IN MODULAR CONSTRUCTION 


 

The equipment of an operating theater department, including operating table, lamps, ventilation, etc., can be almost completely installed im modular construction in prefabrication at the plant of ADK.

This saves time and unnecessary transport routes (floors).  

Do you want to learn more?

 

Implementation of the architect's plan in modular design