EXTENSION ON RUNNING CLINIC OPERATION

The increase of the Sana heart surgery in Stuttgart could be done without interruption of the patient care due to modular construction.

Already in the factory in Neresheim the modules were equipped with floor coverings, windows, furniture and even large parts of the installations. With this high prefabrication, the modules were delivered and only had to be assembled. Through the prefabrication, the patient care during the assembly work could be maintained in the usual way.

The result is a new, state-of-the-art ward for Sana Herzchirurgie.

Modules

Area

Levels

Construction time on site


40

1.800 m²

2

3 months