New innovation center for the international pharmaceutical company Merck.

64 modules with a length of up to 15.4 m, a width of 4.6 m and a height of 4.5 m were installed on an area of 3,150 m². Due to the cubature as a design element in the façade design, the modules were visually highlighted. An indented pedestal visually lifts the building off the floor and complements the imposing, architectural design.

After completion of the conventionally constructed main building on the opposite side of the street, the modular building was not demolished, contrary to the original planning. It will continue to be used as a visitor center in the future.

Modules

Area

Levels

Construction time on site


64

3.150 m²

2

7 months