WARD IN MODULAR CONSTRUCTION 


 

Basic condition for diagnosis, treatment and recovery is rest.

Disturbance factors are structural expansions connected with permanent construction sites, noise and dirt. Add to that the relatively long construction time.

 - this is different in modular construction.

The uniquely high degree of prefabrication of up to 90 percent ensures an extremely short construction phase on site. In addition, the final assembly of the hospital causes a very low noise pollution.

 

 

In addition, due to the central location of many hospitals, only a limited area is available for construction site equipment.

- no problem for the module construction.

The delivery of the individual room modules is done by heavy transport with subsequent building cranes. Thus, final assembly is also possible via existing buildings. The construction takes only a few days.

 